Turned in my ten-week package design project; had a crit. Received very high praise from my teacher: “Everyone look at this: this is what a ten-week project should look like! I’m giving Nigel an A+.”
Started on new projects in tuesday morning in: in Ad Concepts, I started a new team project to re-position White Castle. (I’m working with Amanda and Jason, the usual suspects.) In Advanced Type, I started a new project to sell baby food to teenage girls.
Continued to be very stressed in Cheryl Steele’s draping class. The latest little burden: I have to go watch a lecture monday morning and write a paper in time for next tuesday’s class.
Almost forgot to take a test for my online Intro to Psych class. Phew—that was a close call!
Got stuck in the elevator in Crane. It went up to the third floor, made a scary sound, and slowly sunk to the second floor. Scary! (I only use the elevator a few times a year. Go figure.)
Had a bad attitude about the brand-new warm weather this week. Temperatures got into the high 70s! My body was not made for weather this warm.